George T. Wilkinson, Inc is celebrating its 60th year! Watch Geoff Sr, George and Geoff Jr reflect on the past and look towards the future.
A Pilgrim visits Wilkinson headquarters to learn about “Turkeys” in the boiler industry.
See how a typical service call demonstrates how George T. Wilkinson is anything but ordinary when it comes to servicing our customers.
See what The Boiler Room Insider would look like if we didn’t have help from our terrific customers and associates.
See how Wilkinson helped Melrose Wakefield Hospital achieve tremendous savings and efficiencies through a deaerator and boiler retrofit.
Long time GTW, Inc. customer Brady Enterprises, Inc. recently reached out to discuss their options regarding rising fuel oil prices and limiting green house gas emissions. GTW, Inc and local utility National Grid devised a plan to bring Brady’s a new natural gas service to be implemented on their existing boilers.
Check out this segment featuring the actual fire side cleaning of a steel fire tube boiler. Watch how Roy Correia from GTW removes the soot from a boiler to ensure maximum thermal heat transfer.
The MGM Grand at Foxwoods was experiencing poor boiler operation due to excessively over sized ultra low NOx gas burners. GTW, Inc. installed smaller ultra low NOx Power Flame burners with Autoflame to ensure minimal short cycling. In addition, GTW, Inc. sized and installed a new steam mitigation system for emissions testing.
Watch owner and founder Geoff Wilkinson and Service Operations Manager John Sieminski explain why Wilkinson Mobile Boilers, Inc. is New England’s #1 source for emergency steam and hot water.
The Wilkinson Approach to Service is simple. Provide our customers with on time highly qualified technicians who will do the job correctly. GTW, Inc was founded on this principle back in 1951 and remains true to this day. Listen to various customers and members of the Wilkinson team explain why GTW, Inc. brings the best every day.
Watch Mass Art’s Director of Facilities Mr. Howie Larosee explain why he continues to do business with GTW, Inc. Mass Art may quite possibly have the cleanest and most organized boiler room in the City of Boston.
GTW, Inc. was fortunate enough to work with Mr. Bob Snow of the Graystone Corporation by installing two AERCO Modulex 1060 natural gas fired condensing boilers. Listen to learn about the features and benefits of this boiler and the accumulated first year savings.
Watch and listen to Boston University’s Mr. Domenic D’Alleva explain the major power plant upgrade at their East Campus Power Plant. This project had it all and the kitchen sink! GTW, Inc is extremely proud of this project and the results.
Meet Mr. Chuck Frye from Northeastern University. Mr. Frye and NU have been long standing customers of GTW, Inc. Listen to Chuck talk about GTW’s role in the on-going maintenance at the main plant.
This video features Millipore’s Regional Facilities Manager Mr. Paul Lukitsch and Boiler Operator Mr. David Bodwell discussing the recent retrofit of their two fire tube boilers to the Limpsfield low O2 burner line in conjunction with the Autoflame system.